Discussing with Lindsey and the club about the best solution for them, informing them that the units were made of Zintec steel for protection as well as the powder coating to help prevent rust, the units would cope perfectly fine outdoors. Once the club had confirmed that they would require one unit for the first team, one for the ladies and then one for the lodge, it was then down to understanding the location the units were set on being positions, then the electrical specifications that were required to ensure that the units were compatible with the clubs set up.
The club then had their units installed at their desired locations, as that worked best for the coaching staff and players, including the unit that was installed for the travelling team to clean their shoes/boots off before going into the changing rooms and other areas of the club. The units were also set in positions so that only the relevant people had access to those areas in and around the club and facilities.