After discussing with the club, we managed to find a way that allowed the club to order a dual unit replacement setup, meaning that they would then have two new units to help with the foot traffic that the experience.
Our engineer Steve attended the installation & commissioning , after discussing with the club beforehand about where they wanted the units to be installed. The electrics were already in place due to the previous units that the club had. Once Steve had finished the installation and commissioning of the clubs new AIR-EZE Fairway™ units, he then re-ran through the low maintenance required with the relevant and appropriate people just to ensure that they are fully aware of what’s required.