When arriving at the club to decommission the old unit, and install the new unit, we were luckily greeted by Roger and the Greens staff who were on hand to help if needed. After decommissioning the old unit, disassembling it, and loading it onto the club’s tractor to be disposed of, it was onto the installation of the new unit.
The installation of the new unit took just shy of an hour, with our AIR-EZE certified engineer Duncan on hand, who was able to install & Commission everything, as well as create a short maintenance and usage video for the club as requested in no time at all.