Now onto the installation, this was the first of the three units that the Football Association of Wales acquired. The club had a small section already prepared for the unit to be installed, meaning that the focus then was working on the electrical requirements that the club need in terms of for the power supply etc.
Our engineer Duncan attended the installation, once the unit had been installed and commissioned at the discussed location for the coaches, staff, and players to clean their shoes/boots off before going into their changing rooms and other areas of the club and venue, Duncan then provided all CofC’s, and other relevant paperwork to the club.