Onto the install, after some discussions with Nicola at Celtic FC, it was decided that a single unit system would be used in at Lennoxtown for the coaches and staff, whilst two units would be installed up at Barrowfield. It was decided that the club would have a dual unit system installed at Barrowfield to cope with the number of players that could potentially be coming off the pitches at any given time. Once this had been agreed, we then began speaking to the club about the potential requirements they had in terms of the cable length, plug type etc. to ensure that the location that the club were looking at, the unit would have sufficient output to be placed there. Our engineer Robert carried out the installation, being a Celtic FC fan he was more than happy to attend the club. Upon arrival, Robert was greeted and shown to the where the unit was going to be placed.
After the unit had been installed and positioned at the discussed location for the coaches and staff to clean their shoes/boots off before going into their changing rooms and other areas of the club, Robert then provided all CofC’s, and other relevant paperwork to the club.