Ardent Sports got in touch regarding Brentford FC wanting to potentially discuss acquiring one our AIR-EZE Bootboy™ units at the club.
Client’s Situation
With Brentford FC having a mass of teams ranging from the first team through to the B team, Ladies First, Ladies B team, Under-19’s and then under 18’s, and with such a large outlay of players, there are a lot of boots to clean for the staff, meaning that quite a lot of time on a regular basis was being taken up by the tedious task of cleaning off the boots.
Our Solution
Onto the install, after some discussions with both Ardent Sports and representatives at the club, it was decided that the club would have a dual unit system installed to cope with the number of players that could potentially be coming off of the pitches at any given time. Once this had been agreed, we then began speaking to the club about the potential requirements they had in terms of the cable length, plug type etc. to ensure that the location that the club were looking at, the unit would have sufficient output to be placed there. Our engineer Steve carried out the dual installation at the location, and upon arrival, Steve was greeted and shown to the where the units were going to be placed.
After the units had been installed and positioned at the discussed location that was proposed as the best place for the coaching staff and players to clean their shoes/boots off before going into their changing rooms and other areas of the club, Steve provided all CofC’s, and other relevant paperwork to the club.
Client’s Benefits
Since the units have been installed, the club mentioned on to Arden that they are a great addition to the club, and they have gone on to have the units serviced and maintained by us as Ekom trained and AIR-EZE certified engineers.