Belton Park Golf Club

Introduction

Lee the clubs course manager reached out to us about the potential of having a second unit installed to go alongside their existing.

Client’s Situation

In terms of issues, the club already had a unit installed so all electrical work and positioning had been done on the previous install.

Our Solution

Speaking to the club, it was clear that the layout was as thought.. the second unit was to then be installed next to the first unit, where the footboxes will collect most of the debris.

Client’s Benefits

Club are very happy with their set up and are now picking up the foot traffic that is coming through the club.