With this being the second install at the club, we at AIR-EZE understood the club’s requirements, and the club had first hand seen the performance from the first unit. After speaking to the club and meeting on a suitable position of the second unit, we agreed on a single unit for the academy team to be best suited to requirements. Our engineer Steve also carried out the install at the academy, and upon arrival, Steve was greeted and shown to the location where the unit was ideally going to be placed similarly to the first time he attended.
The club then had their second unit installed and positioned at the discussed location, as that worked best for the academy coaching staff and players to clean their shoes/boots off before going into their changing rooms and other areas of the club. Conveniently, it was situated just outside the door meaning the players/staff could clean their boots off and get inside.